Maintenance

JC
ID Title Priority Status Actions
WO-001
Broken AC Unit — Room 302
Air conditioning unit in Room 302 is not cooling. Temperature readings above 32°C during peak hours.
High In Progress
WO-002
Leaking Roof — Library 3rd Floor
Water leaking through ceiling tiles near the study area. Multiple ceiling tiles damaged. Risk of damage to books and equipment.
Critical Open
WO-003
Elevator Maintenance — Commerce Building
Annual elevator inspection and maintenance. Elevator will be out of service for 2 days.
Medium Scheduled
WO-004
Replace Fluorescent Lights — Lab 201
Three fluorescent tube lights flickering in Lab 201. Replaced with LED alternatives.
Low Completed
WO-005
Fix Door Lock — Office 214
Electronic door lock malfunctioning. Faculty member locked out of office.
Medium In Progress
WO-006
Plumbing Issue — Student Union Restroom
Blocked drain in men's restroom on ground floor causing flooding.
High Open